广元煌褂旅行社

當(dāng)前位置:

2016年ACCA考試《財務(wù)管理》知識點(3)

發(fā)表時間:2016/7/13 15:40:03 來源:互聯(lián)網(wǎng) 點擊關(guān)注微信:關(guān)注中大網(wǎng)校微信
關(guān)注公眾號

Strategic planning in an age of turbulence (三)

Planning approaches

Three approaches to strategy are summarised in Johnson, Scholes and Whittington’s strategic lenses:

1. Strategy as experience. Here, strategic development is the adaptation of past strategies based on experience. In this view, strategy is greatly influenced by taken for granted assumptions, one of which is that the world will advance in a gradual, linear and relatively predictable way.

2. Strategy as design. Here, strategy development is a process of logical and rational thought. Developments that arise are evaluated, resources allocated and specific strategies are followed.

3. Strategy as ideas. Strategies are needed to cope with uncertain, unpredictable and changing environments.

There are analogies here with a suggestion made by Professor Vijay Govindarajan – namely that organisations should place their planning projects into three boxes:

? Short term – projects here are about managing the present and would include process improvement, product and market development. These projects are in response to linear (therefore non-turbulent) changes in an industry.

? Medium-term – projects here concern ‘selectively forgetting the past’ and they are driven by non-linear changes such as the Internet and the ‘Arab Spring’. Projects here are aimed at moving into areas neighbouring the organisation’s core activities.

? Long term – entirely new business ventures. Very speculative, and based on many assumptions.

It is important to realise that the three approaches in each model are not mutually exclusive and that all three will be carried on in parallel:

? It is important that the present is managed carefully and making use of experience and expected developments.

? It is also important that organisations move forward steadily and adapt to changing opportunities.

? At the same time, organisations should be aware of, or should attempt to predict, more radical longer-term changes. Although those changes might not be in place for 10–20 years, work to prepare for them might have to begin now.

In relatively stable times, a company might divide its projects and efforts over the three categories in the ratio 50/30/20. Note that even under conditions of stability, substantial effort should be given to long-term projects.

In turbulent times, companies that are panicked will have projects in category 1 only. They become obsessed about clinging to the safe and familiar, and important longer-term projects might be abandoned. However, a better approach would be to keep projects in all three categories, but perhaps reduce the number in each. Reducing the number in each provides some safety because less investment spent on projects provides something of a buffer in turbulent conditions. However, this approach allows attention still to be paid to the long-term future of the organisation by insisting that longer-term projects are always important.

編輯推薦:

2016年9月ACCA考試時間9月5日-9日


(責(zé)任編輯:)

2頁,當(dāng)前第1頁  第一頁  前一頁  下一頁
最近更新 考試動態(tài) 更多>
林州市| 辽阳县| 遵义市| 岑溪市| 白水县| 高陵县| 隆化县| 桃江县| 绵阳市| 瓦房店市| 儋州市| 夏津县| 浠水县| 林口县| 开化县| 孝昌县| 达尔| 合作市| 陇川县| 房山区| 荆门市| 恩施市| 揭西县| 尤溪县| 麟游县| 高雄县| 晋江市| 仙游县| 株洲县| 临澧县| 嘉定区| 洛南县| 东丽区| 云浮市| 榆社县| 黑龙江省| 长汀县| 晋宁县| 中山市| 马龙县| 屯门区|